Development of a strtegy for the collection and recycling of photovoltaik modules at waste collection centres in Upper Austria
Abstract
The market for photovoltaic modules is increasing strongly. Within EU in 2010 some 29 GWp have been installed, for 2015 an installed capacity of 69 GWp is expected. Against this background an increasing mass of end-of life needs to be taken into account. In the project scenarios for technical suitable and economically feasible collection and recycling of photovoltaic modules at municipal collection centres in Upeer Austria are developed.
Project staff
Stefan Petrus Salhofer
Ao.Univ.Prof. Dipl.-Ing. Dr.nat.techn. Stefan Petrus Salhofer
stefan.salhofer@boku.ac.at
Tel: +43 1 47654-81342
Project Leader
01.10.2015 - 30.04.2016
Peter Beigl
Dipl.-Ing. Mag.rer.soc.oec. Peter Beigl
peter.beigl@boku.ac.at
Tel: +43 1 47654-81314
Project Staff
01.10.2015 - 30.04.2016
Florian Part
Priv.-Doz. Dipl.-Ing. Dr. Florian Part
florian.part@boku.ac.at
Tel: +43 1 47654-81344
Project Staff
01.10.2015 - 30.04.2016
Silvia Scherhaufer
Dipl.-Ing.(FH) Silvia Scherhaufer
silvia.scherhaufer@boku.ac.at
Tel: +43 1 47654-81334
Project Staff
01.10.2015 - 30.04.2016