Physical model test on weir system Rottau
Abstract
VERBUND Hydro Power GmbH (VHP) intends to adapt the stilling basin of the weir system Rottau to the current hydraulic conditions due to changed hydrological discharge values on the Möll/Carinthia. For this purpose, a hyraulic model on a scale of 1:30 or larger will be built in order to check the capacity of the weir system and the functionality of the stilling basin. If necessary, the stilling basing will be optimized.
Project staff
Christine Sindelar
Priv.-Doz. Mag. Dipl.-Ing. Dr.techn. Christine Sindelar
christine.sindelar@boku.ac.at
Tel: +43 1 47654-81944
Project Leader
01.08.2023 - 31.07.2024
Thomas Gold
Dipl.-Ing.Dr. Thomas Gold
thomas.gold@boku.ac.at
Tel: +43 1 47654-81937
Project Staff
01.08.2023 - 31.07.2024
Kevin Reiterer
Dipl.-Ing.Dr. Kevin Reiterer
kevin.reiterer@boku.ac.at
Tel: +43 1 47654-81937
Project Staff
01.08.2023 - 31.07.2024