Evaluation of the alvalanche risk in St. Anton.
Project management Kleemayr Karl
organizational unit Institute of Mountain Risk Engineering
duration 10.03.1997 to-
31.07.1997
Research project (§ 26 & § 27)
Program none
Funder none
Competencies
Abstract
Some of the ski lifts in MOOSTAL called 'Rendllifte' as well as the ski slopes of that place are exposed to avalanche risk. The main objective of the study is the development of a concept to maximize avalanche security in this area by optimizing avalanche control measures on the basis of an objective determination of the avalanche risk. Risk analysis provide informations about the areas with high risk potential. These informations are important to develop security measures.
keywords avalanche risk analysis
Publikationen
Project staff
Karl Kleemayr
Ass.Prof. Dipl.-Ing. Dr.nat.techn. Karl Kleemayr
Project Leader
10.03.1997 - 31.07.1997