Engineering geological mapping for a slope stabilization in phyllitic rocks.
Project management Schwingenschlögl Rudolf
duration 01.04.1994 to- 30.06.1995
Research project (§ 26 & § 27)
Program none
Funder none
Competencies
Abstract
For stabilization purposes great bore wells (6x4m) were fixed on the lowest position of the instable rock slope. These elliptical shafts also were filled with reinforced concrete. This is a kind of 'slope-doweling'.