Engineering geological mapping for a slope stabilization in phyllitic rocks.
Project management Schwingenschlögl Rudolf
organizational unit Institute of Applied Geology
duration 01.04.1994 to-
30.06.1995
Research project (§ 26 & § 27)
Program none
Funder none
Competencies
Abstract
For stabilization purposes great bore wells (6x4m) were fixed on the lowest position of the instable rock slope. These elliptical shafts also were filled with reinforced concrete. This is a kind of 'slope-doweling'.
keywords rock slide phyllite bore shaft slope doweling
Publikationen
Project staff
Rudolf Schwingenschlögl
Ao.Univ.Prof.i.R. Dr.phil. Rudolf Schwingenschlögl
rudolf.schwingenschloegl@boku.ac.at
Tel: +43 1 47654-87216
Project Leader
01.04.1994 - 30.06.1995