Prefeasibility FAH Ybbs und Aschach
- Wasser - Atmosphäre - Umwelt
- Lebensraum und Landschaft
- Nachwachsende Rohstoffe und neue Technologien
Abstract
The hydropower stations Ybbs-Persenbeug und Aschach don't have lateral open planes to establish conventional fish migration devices (river and pool passes). In a first step a pre-feasibility study should target on technical possibilities to let fish migrate upstream under specific circumstances around the obstacles. The targeted techniques are different types of "fish-lifts", pool passes in combination with vertical slot devices. Archimedical spirals and combinations with fish-lifting spirals will be described to certain details in space and suitability.
- fish migration device
- Danube hydro power station
Project staff
Herwig Waidbacher
Ao.Univ.Prof.i.R. Dr.phil. Herwig Waidbacher
herwig.waidbacher@boku.ac.at
Tel: +43 1 47654-81222
Project Leader
15.10.2013 - 31.03.2016
Silke-Silvia Michelitsch
Dipl.-Ing. Silke-Silvia Michelitsch MBA
silke.michelitsch@boku.ac.at
Tel: +43 1 47654-81226
Project Staff
15.10.2013 - 31.03.2016