Matthias Kaltenbrunner
Dipl.-Ing. Matthias Kaltenbrunner
Status left BOKU
Projects
0 Projects found.
filter result: categorie
Publications
Knowledge Transfer to Society
Media
Lectures
(2018) Optimization Models of Floorboard Toplayer Assembly
Autoren: Kaltenbrunner, M; Huka, MA; Gronalt, M
29th European Conference on Operational Research 2018
(2018) Kombinierte Absatz- und Produktionsplanung in der Säageindustrie: Modelle und Implementierung
Autoren: Kaltenbrunner, M; Huka, MA; Gronalt, M;
6. Fachtagung Entscheidungsunterstützung in der Logistik (EULOG)
(2017) Aggregated and detailed production planning for the sawing industry
Autoren: Kaltenbrunner, M; Huka, MA; Gronalt, M;
IUFRO Division 5 Conference, SWST 60th International Convention 2017
(2016) Aggregated and detailed production planning for the sawing industry
Autoren: Kaltenbrunner, M; Gronalt, M;
IUFRO Division 3 Doctoral Student Conference
Decision support system for the assemble of floorboard top layers
Autoren: Kaltenbrunner, M; Huka, MA; Gronalt, M;