Optimisation of subsurface flow constructed wetlands for wastewater treatment - Part 2
Project management Langergraber Günter
duration 01.05.2005 to- 30.06.2007
Research project (§ 26 & § 27)
Program none
Funder National: Companies
Competencies
Abstract
Based on the results of the first part of the project the main goals for the second parts were defined as 1) enhanced nitrogen removal using a two-stage subsurface vertical flow constructed wetland, 2) investigation of possible reduction of investment costs, and 3) stabilization of the operation during winter conditions.
Publications
Experiences with a top layer of gravel to enhance the performance of vertical flow constructed wetlands at cold temperatures.
Autoren: Langergraber, G; Pressl, A; Leroch, K; Rohrhofer, R; Haberl, R; Jahr: 2009
Journal articles
Project staff
Günter Langergraber
Priv.Doz.DI Dr.nat.techn. Günter Langergraber
guenter.langergraber@boku.ac.at
Tel: +43 1 47654-81001, 81111
Project Leader
01.05.2005 - 30.06.2007
BOKU partners
External partners
verschiedenen Kläranlagen in Österreich
DI Christoph Prandstetten
coordinator