Abstract
The hydroelectric power plant Reidmühle at the Thaya river has been restorated. In the frame of the restoration a bypass-system which enables the downstream migration of fish has been intalled. migrating fish are diverted through a pipe from the impondment upstream to downstream river sections. At the lower end of the pipe a trap will be installed to collect downstream migrating individuals
Publikationen
Project staff
Günther Unfer
Dipl.-Ing. Dr.nat.techn. Günther Unfer
guenther.unfer@boku.ac.at
Tel: +43 1 47654-81213
BOKU Project Leader
01.09.2011 - 31.08.2012
BOKU partners
External partners
BAW - Ökologische Station Waldviertel
Dr. Christian Bauer
partner