UTN II – WP2, PCP „GT Aspern“ (geothermiccenteraspern); Feasibility Study – Phase I (Pre-Feasibility)
Abstract
The study was able, on the one hand, to corroborate the prior suppositions that a sufficient geothermal potential is available at Wien, Aspern, to implement an economically feasible heating energy and warm water supply for the future housing and industrial estate there, and on the other hand to define the technical benchmarks implied by the facts that could be established. As a further implication of these findings a detailed feasibility study shall now be prepared in accordance with the guidelines set forth in the preceding section. The final document is expected to contain a complete implementation schedule for, as well as a master plan of, a geothermal pilot plant.
keywords Geothermal energy Vienna basin
Publikationen
Project staff
Jean Friedrich Schneider
O.Univ.Prof. Dipl.-Ing. Dr.nat.techn. Jean Friedrich Schneider
jean.schneider@boku.ac.at
Project Leader
17.05.2005 - 13.01.2006
Wolfgang Straka
Mag. Dr.rer.nat. Wolfgang Straka
wolfgang.straka@boku.ac.at
Tel: +43 1 47654-87215
Sub Projectleader
17.05.2005 - 13.01.2006
BOKU partners
External partners
Arndt Rainier, Dr., Allg.beeid.u.zertif. SV für Geophysik
none
partner
Wessely Godfried, Prof.Dr.
none
partner
Götzl Gregor, Mag.
none
partner
Technische Universität Wien, Institut für Thermodynamik und Energiewandlung
Prof. Dr. Andreas Werner DI. Franz Binder
partner