Investigations at the soil bioengineering test flume at the river Rhein (Worms)
Abstract
In the project the riparian vegetation and erosion of a 1 km long test section at the Rhine at Worms with different bioengineering measures will be investigated regularly (April to September 2012) to observe and evaluate the vegetation development, the occurring erosion and the soil stabilizing effect of the individual measures in the first growing season. The construction of the test section was carried out in cooperation of the Water and Shipping Administration of Mannheim, the Federal Institute of Hydrology in Koblenz and the Federal Waterways Engineering and Research Institute in Karlsruhe.
keywords Soil bioengineering water protection near nature river engineering river bank protection erosion
Publikationen
Project staff
Florin Florineth
Em.O.Univ.Prof. Dr.phil. Florin Florineth
florin.florineth@boku.ac.at
Project Leader
01.04.2012 - 30.11.2012
Manuel Sokopp
Dipl.-Ing. Dr. Manuel Sokopp Bakk.techn.
manuel.sokopp@boku.ac.at
Project Staff
01.04.2012 - 30.11.2012