Optimisation of subsurface flow constructed wetlands for wastewater treatment - Part 3
- Forschungscluster "Landschaft & Entwicklung"
Abstract
Based on the results of the first and second part of the project the main goals for the second parts is to optimize enhanced nitrogen removal using a two-stage subsurface vertical flow constructed wetland.
Publications
Comparison of the behaviour of one- and two-stage vertical flow constructed wetlands for different load scenarios
Autoren: Langergraber, G., Pressl, A., Leroch, K., Rohrhofer, R., Haberl, R. Jahr: 2010
Conference & Workshop proceedings, paper, abstract
external links and characteristics of the publication:Long-term behaviour of a two-stage CW system regarding nitrogen removal
Autoren: Langergraber, G., Pressl, A., Leroch, K., Rohrhofer, R., Haberl, R. Jahr: 2010
Conference & Workshop proceedings, paper, abstract
external links and characteristics of the publication:
Project staff
Günter Langergraber
Priv.Doz.DI Dr.nat.techn. Günter Langergraber
guenter.langergraber@boku.ac.at
Tel: +43 1 47654-81111
BOKU Project Leader
16.08.2007 - 30.06.2009
Raimund Haberl
Univ.-Prof. i.R. Dipl.-Ing.Dr.nat.techn. Raimund Haberl
raimund.haberl@boku.ac.at
Project Staff
16.08.2007 - 30.06.2009
Alexander Pressl
Dipl.-Ing.Dr. Alexander Pressl
alexander.pressl@boku.ac.at
Tel: +43 1 47654-81123
Project Staff
16.08.2007 - 30.06.2009